A leaderboard "success rate of 65%" answers only one question: can it do it? Whether you can actually hand work to an agent depends on another: does it do it every time? This issue covers four measurement tools that separate "once" from "every time": pass^k, time horizons, hazard-rate models, and the uncertainty of tail extrapolation. Prerequisites: Day 15 Evaluation & Benchmarks, Day 56 Evaluation Reproducibility.
pass@k is like reading from replicas: success if any one of k replicas responds. pass^k is like a serial call chain: all k calls must succeed for the chain to be available. Same component, two composition rules, wildly different availability.
Code generation has long used pass@k (the Codex paper, Chen et al. 2021): sample k times on the same problem; it counts as solved if at least one sample passes the unit tests. That fits settings where tests let you pick the best output. But agent tasks such as customer service, placing orders or editing a database offer no chance to pick: each real user gets one shot. τ-bench (Yao et al. 2024) therefore proposed pass^k: run the same task k times independently, and it counts only if all succeed. The paper reports that even GPT-4o completes fewer than 50% of tasks, and pass^8 in the retail domain falls below 25%.
Both use unbiased estimators. With n runs per task and c successes:
The key intuition is task heterogeneity. If every task had success rate p, pass^k would be p^k and fall exponentially with k. In practice it is more common that "some tasks are always right, some are almost always wrong". pass^k is the average of each task's p_i^k, not the average p raised to the k — and the former decays far more slowly. So the shape of the pass^k curve is itself a diagnostic: a steep drop means failures are random and a fresh attempt may turn out differently; a curve that quickly flattens means failures concentrate on a fixed set of tasks, and no number of retries helps.
This also explains why retries sometimes work and sometimes don't. If attempts are independent, the chance of at least one success in k is 1 − (1 − p)^k, and retry gains accumulate fast; but that formula assumes failures are random. When failures concentrate on fixed tasks, retrying just hits the same blind spot again. Put differently, the gap between pass@k and pass^k tells you how much failure is "bad luck" and how much is "can't do it".
from math import comb def pass_at_k(n, c, k): return 1 - comb(n - c, k) / comb(n, k) # at least once def pass_hat_k(n, c, k): return comb(c, k) / comb(n, k) # every time # 10 tasks, n=8 runs each: 6 always succeed, 4 succeed only 1 of 8 times n, succ = 8, [8]*6 + [1]*4 for k in (1, 4, 8): at = sum(pass_at_k(n, c, k) for c in succ) / len(succ) hat = sum(pass_hat_k(n, c, k) for c in succ) / len(succ) print(f"k={k}: pass@k={at:.2f} pass^k={hat:.2f}") # k=1: 0.65 / 0.65 k=4: 0.80 / 0.60 k=8: 1.00 / 0.60 p = sum(succ) / (n * len(succ)) print(f"If failures were fully random, the same 65% gives pass^8 = {p**8:.3f}") # 0.032
Same 65% single-shot success rate: with concentrated failures pass^8 = 0.60; with random failures, only 0.03. A leaderboard that reports only pass@1 treats these two systems as identical.
Like p50 and p99 in latency monitoring: the same service looks fast at the median and may be an order of magnitude slower at the tail. The 50% and 80% time horizons are the "median" and "tail" of reliability.
Success rates across benchmarks aren't comparable: 60% on SWE-bench and 60% on τ-bench mean different difficulty. METR (Kwa et al. 2025, arXiv:2503.14499) introduced a common ruler: have human experts do the same tasks and record their time, then ask "on tasks how long does the model still succeed 50% of the time?" That length is the 50% time horizon; raise the bar to 80% and you get the 80% time horizon.
The method fits a logistic curve of success against the log of task length:
P(success | length t) = σ(α − β·ln t)
σ is the S-shaped function squashing any real number into 0–1; α sets where the curve crosses 50% (how strong the model is); β is the steepness — large β means success drops sharply around some length, small β means it decays slowly with length. Solving for the two horizons gives a neat result:
h50 / h80 = 41/β
(The 4 comes from the 80/20 odds.) That is, the ratio of 50% to 80% horizons depends only on the slope β, not on how strong the model is. At β = 1 the ratio is 4; at β = 0.7 it is about 7. In the early paper, Claude 3.7 Sonnet's two horizons were about 59 and 15 minutes, a ratio of about 4. Why the log of length? Because difficulty grows multiplicatively: going from 1 minute to 10 minutes spans the same "order of magnitude" as going from 1 hour to 10 hours. On this basis METR reports that the 50% horizon of frontier models has doubled roughly every 7 months since 2019. Later community estimates for newer models show the ratio has not narrowed as capability rose, and is larger for some models — the curve has flattened: long tasks occasionally succeed, but short tasks occasionally fail too.
import math def horizon(alpha, beta, q): # solve σ(α − β·ln t) = q → ln t = (α − logit(q)) / β logit = math.log(q / (1 - q)) return math.exp((alpha - logit) / beta) for beta in (1.0, 0.7): alpha = beta * math.log(60) # both curves have h50 = 60 minutes h50, h80 = horizon(alpha, beta, 0.5), horizon(alpha, beta, 0.8) print(f"β={beta}: h50={h50:.0f}min h80={h80:.1f}min ratio={h50/h80:.1f}x") # β=1.0: h50=60min h80=15.0min ratio=4.0x # β=0.7: h50=60min h80=8.3min ratio=7.2x
Like the bathtub curve in hardware reliability: new disks fail often early, and once past "infant mortality" they become stable. The question is whether agent failure looks more like "a fixed chance of slipping each minute" or "most likely to crash at the start".
The time horizon is an empirical fit; it doesn't say why success falls with length. In 2025 Toby Ord proposed the simplest mechanistic hypothesis (arXiv:2505.05115): a constant hazard rate (the probability of failing in the next minute, given you've made it this far). With a fixed per-minute failure probability, a task is like n serial steps, success = p^n, an exponential decay — like radioactive decay, the 50% horizon is exactly the agent's "half-life". The appeal is that one parameter yields every horizon.
In early 2026, Gus Hamilton refit METR's data with the more general Weibull distribution from survival analysis:
S(t) = exp(−(t/λ)k)
S(t) is the probability of surviving to length t; λ is the time scale, tracking model strength; k is the shape parameter: k = 1 reduces to constant hazard, k < 1 means the hazard falls as the task proceeds, k > 1 means errors become more likely over time. Every model's k came out significantly below 1, clustering around 0.6, and k barely changed as models improved — progress showed up mainly in λ. Ord then publicly changed his view, conceding the constant-hazard assumption doesn't hold. Secondary summaries also report a lower k for the human baseline (about 0.37), which Hamilton reads as humans being better at self-correction: once past the start, they get steadier.
The consequence is asymmetric: compared with a constant-hazard model with the same 50% horizon, k < 1 means long tasks beyond the horizon go better than expected, while short tasks go worse — the risk concentrates at the start of a task (understanding the requirement, picking the wrong path).
k < 1 also has a purely statistical source worth being wary of: selection. Even if every task type has a constant hazard, mixing "easy" and "hard" tasks means the hard ones drop out early and the survivors are mostly easy ones, so the aggregate hazard appears to fall. Survival analysis calls this the heterogeneity (frailty) effect. So k below 1 may mean "the model gets steadier as it goes", or merely "task difficulty is uneven" — telling them apart requires observing when failures occur within a task, not just the final outcome.
import math def survival(t, h50, k): lam = h50 / math.log(2) ** (1 / k) # makes S(h50) exactly 50% return math.exp(-(t / lam) ** k) for k in (1.0, 0.6): # constant vs decreasing hazard row = [f"{t}min:{survival(t, 60, k):.2f}" for t in (5, 15, 240, 600)] print(f"k={k}", " ".join(row)) # k=1.0 5min:0.94 15min:0.84 240min:0.06 600min:0.00 # k=0.6 5min:0.86 15min:0.74 240min:0.20 600min:0.06
Both curves have a 60-minute 50% horizon. At k = 0.6, success on a 5-minute task drops from 94% to 86%, while a 10-hour task rises from nearly zero to 6%.
Like estimating p99.99 latency from a few hundred request samples: the data never reach that range, so the number mostly reflects the distribution you assumed, not the system; and if the load-testing tool itself jitters, the measured tail is mixed with the tool's noise.
When reliability really matters, we want the 99% or even 99.9% horizon — the range where something can run unattended. But benchmarks have a limited number of tasks, so the high-reliability range has almost no data points; it can only be reached by extrapolating the curve. Two sources of error stack up here:
import math h50 = 60.0; r = 6.6 # both models: h50=60min, h50/h80=6.6 inv_b = math.log(r) / math.log(4) # 1/β for log-logistic k = math.log(math.log(2) / -math.log(0.8)) / math.log(r) # Weibull k (≈0.60) for q in (0.8, 0.99, 0.999): ll = h50 / (q / (1 - q)) ** inv_b wb = h50 * (-math.log(q) / math.log(2)) ** (1 / k) print(f"{q:.1%}: log-logistic={ll:.4f}min Weibull={wb:.4f}min ratio={ll/wb:.1f}x") # 80.0%: ratio=1.0x 99.0%: ratio=2.2x 99.9%: ratio=4.4x p_agent, sim_crit = 0.90, 0.12 # agent itself 90%, simulator 12% critical errors for n in (1, 4, 8): print(n, round(p_agent**n, 2), round((p_agent * (1 - sim_crit))**n, 2)) # 1 0.9 0.79 4 0.66 0.39 8 0.43 0.15 ← measured pass^8 is ~1/3 of the true value
The second part simplifies simulator errors as independent events, only to illustrate that "environment noise compounds in pass^k".