The most common slide in corporate change training is the Kübler-Ross change curve: once a change is announced, people go through shock and denial, then anger, bargaining and depression, and finally acceptance, with morale tracing a U. It comes from the "five stages of grief" that psychiatrist Elisabeth Kübler-Ross described in terminally ill patients in On Death and Dying (1969). Management consultants later borrowed it for organizational change; who adapted it first is no longer clear.
It is not alone. In 2002, Elrod and Tippett compared models of change from grief, organizational change, group development, learning and other fields, and found that almost every one of them draws the same dip in the middle. This issue puts these studies side by side: what they get right together, where later research that tracked real people overturned them, and how a leader should use them.
"This is a great opportunity, the new charter is bigger, we'll have more impact!" What the room is thinking: and what about the thing I've been building?
"Let me be clear about what ends: we no longer own X, and the weekly Y sync stops next month. What you've built on X over these years is real skill, and it doesn't stop counting because we changed orgs. What stays the same: your managers, your current projects, this quarter's perf cycle. What's new is..." End by setting a time to answer the questions nobody has worked out yet.
Do: for a change you're driving, write the "what ends" list, grouped by who is affected.
Think: in your own last change, what was hardest for you to let go of?
"He's slipped back into anger." Or schedule an all-hands change-psychology workshop, so that people who were fine start to feel they ought not to be.
In the 1:1, ask: "What was hardest this week?" Swinging back and forth is normal. What deserves attention is a signal that lasts for weeks: dropping out of discussions, getting stuck on the same issue again and again, pulling away from colleagues. When those show up, invest more.
Do: list everyone on your team and mark only the people where you see a sustained signal. Everyone else needs no extra intervention.
Think: how do you decide someone "has accepted it"? From what they do, or because they've stopped talking?
The first throws away the learning cost the team already paid; the second makes your boss think you can't see the problem.
"Before launch we agreed: within six weeks, speed back to 90% of where it was, with the rework rate down. We're in week three and the drop is within what we expected. I watch two leading signals each week: the number of issues stuck on the new process, and the rework rate. If we're not back by week six, we roll back as agreed."
Do: for one change you own, write three lines: how long it will be slower, when you'll evaluate, and how bad it has to get before you roll back.
Think: how many changes is your team absorbing at the same time right now?
A few weeks later you learn that what the engineer kept saying was that the new boundary would double his on-call load.
"What exactly is he objecting to: the plan, something he's losing, or how we decided?" If it's the plan, write his argument down and evaluate it properly; if it's a loss, talk with him about what that thing meant to him; if it's the process, ask him before the next decision.
Do: pick one objection you've heard recently, decide which of the three kinds it is, and respond to that kind.
Think: the last time someone called you "resistant to change," what were you actually protecting?