Day 78 · 2026.11.22

People in Change: The Emotional Curve Is a Map, Not a Timetable

Topic: The Human Side of Change·4 principles
"You cannot step into the same river twice." — Heraclitus (as reported by Plato in the Cratylus)

The most common slide in corporate change training is the Kübler-Ross change curve: once a change is announced, people go through shock and denial, then anger, bargaining and depression, and finally acceptance, with morale tracing a U. It comes from the "five stages of grief" that psychiatrist Elisabeth Kübler-Ross described in terminally ill patients in On Death and Dying (1969). Management consultants later borrowed it for organizational change; who adapted it first is no longer clear.

It is not alone. In 2002, Elrod and Tippett compared models of change from grief, organizational change, group development, learning and other fields, and found that almost every one of them draws the same dip in the middle. This issue puts these studies side by side: what they get right together, where later research that tracked real people overturned them, and how a leader should use them.

Five drawings of the same curve · start · dip · exit
Model
Start
Dip
Exit
Kübler-Ross change curve
Shock, denial
Anger, bargaining, depression
Experiment, acceptance
Lewin's three steps (as usually told)
Unfreeze
Change
Refreeze
Bridges' transitions (1991)
Ending: letting go
The neutral zone
The new beginning
Satir change model
A foreign element breaks the old status quo
Chaos
Transforming idea, practice, new status quo
Fullan's implementation dip
Rolling out a new practice
Performance and confidence drop
Recovery once the new skills take hold
Models from every field draw this dip. But studies that tracked real people found most of them never travel the full U.
PRINCIPLE 01 · START WITH THE ENDING

Change Happens Outside; Transition Happens Inside Change Is External, Transition Is Internal

Bridgesending · neutral zone · new beginningname the loss
William Bridges separated two things: change is an external event, announced one day and effective another; transition is the inner adjustment, which is much slower and begins with an ending, not a beginning. People have to let go of the old before they can take hold of the new. So when you announce a change, say first what is ending: which team no longer owns what, which recurring meetings stop, who no longer reports to whom. Acknowledge these as real losses and don't run down the past. Then say what stays the same, and only then what is new. The "neutral zone" between old and new is where things get messy; give it temporary structures and short-term goals.
"It isn't the changes that do you in, it's the transitions." — William Bridges, Managing Transitions, 1991
Situation: the reorg is final and your team is moving into another org. You are announcing it at an all-hands.
✗ Only talk about the opportunity

"This is a great opportunity, the new charter is bigger, we'll have more impact!" What the room is thinking: and what about the thing I've been building?

✓ Try: ending first, then what stays, then what's new

"Let me be clear about what ends: we no longer own X, and the weekly Y sync stops next month. What you've built on X over these years is real skill, and it doesn't stop counting because we changed orgs. What stays the same: your managers, your current projects, this quarter's perf cycle. What's new is..." End by setting a time to answer the questions nobody has worked out yet.

  • Have I said clearly what is ending?
  • What is each person losing: scope, status, familiar colleagues, or part of an identity?
  • Have I run down the old way to sell the new one?
  • Does the neutral zone have temporary structures and short-term goals?
  • Treating the announcement as done: the org chart changes that day; people take months to finish the transition.
  • "The old way was broken, so we're changing it": the people most invested in the old way hear "your last few years were wasted."

Do: for a change you're driving, write the "what ends" list, grouped by who is affected.

Think: in your own last change, what was hardest for you to let go of?

PRINCIPLE 02 · DON'T SORT PEOPLE INTO STAGES

The Curve Is a Map, Not a Timetable A Map, Not a Timetable

Maciejewski 2007Bonanno's resilience trajectoriesdual process model
The five stages themselves have little evidence behind them. A 2007 Yale study that followed 233 bereaved people found that acceptance was the strongest feeling from the very start, and the strongest negative feeling was yearning, not denial or anger; the feelings did peak in a rough order, but they were intertwined throughout. Bonanno's studies of widowed people found that roughly half kept functioning normally the whole time; only a minority stayed stuck in the dip. Stroebe and Schut's dual process model describes oscillation: people move back and forth between facing the loss and dealing with the new life, and the swinging itself is healthy. On a team: don't label people with stages, assume most will adjust on their own, and save your energy for the few who are genuinely stuck.
"They were never meant to help tuck messy emotions into neat packages." — Elisabeth Kübler-Ross and David Kessler, On Grief and Grieving, 2005
Situation: two weeks after the reorg announcement, most people are working as usual. A senior engineer who was eagerly planning the new direction last week is complaining in the team channel this week.
✗ Call it a relapse, or put everyone through a class

"He's slipped back into anger." Or schedule an all-hands change-psychology workshop, so that people who were fine start to feel they ought not to be.

✓ Try: treat swings as normal; watch for the real signals

In the 1:1, ask: "What was hardest this week?" Swinging back and forth is normal. What deserves attention is a signal that lasts for weeks: dropping out of discussions, getting stuck on the same issue again and again, pulling away from colleagues. When those show up, invest more.

  • Am I watching specific people, or matching them to stages?
  • Most people are already working normally. Am I disturbing them?
  • Who is showing withdrawal that has lasted weeks, not a day or two?
  • Using the curve as a progress bar: "by week six he should have accepted it." People don't run on schedules.
  • Assuming everyone is suffering: too much care makes the people who adapted well feel treated like patients.

Do: list everyone on your team and mark only the people where you see a sustained signal. Everyone else needs no extra intervention.

Think: how do you decide someone "has accepted it"? From what they do, or because they've stopped talking?

PRINCIPLE 03 · PROTECT THE DIP

The Dip Is the Price of Learning: Say So Early, Set the Criteria Early The Dip Is the Price of Learning

Satir's chaosimplementation dipcriteria up front
If the evidence for the emotional curve is weak, the performance dip is real and common: a new process, system or boundary demands new skills, and you will be slower until you are fluent. Family therapist Virginia Satir's change model calls this stretch "chaos": performance swings up and down and people badly want to go back to the old way. Jerry Weinberg later brought the model to software teams. Education researcher Michael Fullan named the same thing in school reform the "implementation dip." Three moves: before rolling out, tell people how long things will be slower; write down in advance when you will evaluate, against what criteria, and how bad it has to get before you roll back; during the chaos, take other load off the team, and find an early small win that shows people the new way works.
"When a thing reaches its limit, it changes; when it changes, it gets through; when it gets through, it endures." — I Ching, Great Commentary (Xici), Part II
Situation: three weeks into a new development process, delivery speed is down 30%. Your boss asks whether you should roll it back.
✗ Roll back at once, or insist all is fine

The first throws away the learning cost the team already paid; the second makes your boss think you can't see the problem.

✓ Try: bring out the criteria you wrote in advance

"Before launch we agreed: within six weeks, speed back to 90% of where it was, with the rework rate down. We're in week three and the drop is within what we expected. I watch two leading signals each week: the number of issues stuck on the new process, and the rework rate. If we're not back by week six, we roll back as agreed."

  • Did I tell the team and my boss in advance how long it would be slower?
  • Are the evaluation date, criteria and rollback condition written down?
  • During the chaos, which secondary goals have I paused for the team?
  • What is the first visible small win?
  • Passing sentence on data from the dip: the first few weeks measure fluency, not whether the new way is any good.
  • Setting criteria after the fact: by then everyone picks the metric that favors their side.
  • Rolling out several changes at once: each has its own dip, and stacked together they make a hole nobody climbs out of.

Do: for one change you own, write three lines: how long it will be slower, when you'll evaluate, and how bad it has to get before you roll back.

Think: how many changes is your team absorbing at the same time right now?

PRINCIPLE 04 · HEAR THE RESISTANCE

Resistance Is Information, Not a Stage Resistance Is Information, Not a Stage

Ford et al. 2008immunity to changethree kinds of resistance
The worst side effect of stage models is that they let a leader explain every objection as "he's still in the anger stage." A 2008 review by Ford and colleagues argued that resistance is usually framed as the recipients' problem, but the people driving the change share in it: broken promises, vague communication and ignoring objections all create resistance, and resistance itself can expose real holes in a plan. Kegan and Lahey found that people who say they support a change but never move often have an unspoken "competing commitment" protecting something, such as their identity as the expert. So hear resistance as three different things: an objection to the plan itself, which you should evaluate seriously because it may be right; grief over a loss, which you acknowledge rather than argue with; and frustration with the process, such as not being asked or finding out last, which means you fix the process.
"People do not resist change, per se. People resist loss." — Ronald Heifetz and Marty Linsky, Leadership on the Line, 2002
Situation: one of your managers tells you, "He's just in the resistance phase. Give it a few weeks; no need to do anything."
✗ Agree and wait

A few weeks later you learn that what the engineer kept saying was that the new boundary would double his on-call load.

✓ Try: first work out which kind it is

"What exactly is he objecting to: the plan, something he's losing, or how we decided?" If it's the plan, write his argument down and evaluate it properly; if it's a loss, talk with him about what that thing meant to him; if it's the process, ask him before the next decision.

  • Have I seriously checked whether this objection is right?
  • Is it about the plan, about a loss, or about the process?
  • Have I broken a promise myself and created resistance?
  • Pathologizing dissent: once objections are treated as emotions, the clearest voice on the team goes quiet.
  • Arguing with grief as if it were an objection: they miss their old team, you explain the benefits of the new architecture, and you drift further apart.

Do: pick one objection you've heard recently, decide which of the three kinds it is, and respond to that kind.

Think: the last time someone called you "resistant to change," what were you actually protecting?

Crossovers

Ten takeaways

  1. The Kübler-Ross change curve was adapted from the five stages of grief in terminally ill patients; it was borrowed for organizational change, not designed for the workplace.
  2. Models of change from almost every field draw the same dip in the middle, and that dip is what they genuinely share.
  3. Change is an external event and transition is an inner process; transition starts with an ending, so announce what ends first.
  4. Acknowledging the loss and not running down the old way keeps the people most invested in it from feeling their work was wasted.
  5. Studies that tracked real people found acceptance is often the strongest feeling from the start, and the stages are intertwined rather than queued.
  6. Most people keep functioning normally after a change and only a minority stay stuck, so assume most are fine and save your energy for the few.
  7. Swinging between facing the loss and dealing with the new life is healthy, not a relapse.
  8. The performance dip is real and common, so say before rollout how long it will be slower, when you will evaluate, and when you will roll back.
  9. Resistance is often created by the people driving the change and may expose real holes in the plan, so it cannot all be treated as emotion.
  10. Split resistance three ways: evaluate objections to the plan, acknowledge grief over loss, and fix the process when the process is the complaint.

Going deeper

What to read next
  • William Bridges, Managing Transitions (1991): ending, neutral zone, new beginning, with plenty of practical checklists.
  • George Bonanno, The Other Side of Sadness (2009): the popular account of the resilience-trajectory research, a direct challenge to stage theory.
  • Robert Kegan and Lisa Lahey, Immunity to Change (2009): a four-column map for finding your own competing commitments.
  • Gerald Weinberg, Quality Software Management, Vol. 4: Anticipating Change (1997): the Satir model applied to software teams.
  • Ronald Heifetz and Marty Linsky, Leadership on the Line (2002): why leading people through change is itself risky.
If the evidence is weak, why is the Kübler-Ross curve so popular?
Because its value is not in prediction but in giving negative feelings a legitimate name: it tells leaders that anger and low mood after a change are normal and nobody's fault. That part is right. The trouble starts when it becomes a sequence everyone must complete in order. Keep "the feelings are normal," drop "the stages are fixed," and you're using it well.
You are on the curve too, and usually ahead
The people deciding a change often know weeks or months before the team. By announcement day you may already be at the new beginning while the team is only reaching the ending. That lag is what most often fools leaders into thinking everyone should have accepted it by now. Leading managers adds a layer: each manager is absorbing the change while also helping their team absorb it. Give managers their own time first.
Lewin's "unfreeze, change, refreeze" is disputed too
These three steps are often presented as Kurt Lewin's classic model. But when Cummings and colleagues went back to the sources in 2016, they found Lewin mentioned the idea only briefly and never developed it into a systematic model; the model was largely assembled by others after his death. Still, the intuition that old habits must loosen before new ones fit matches Bridges' "start with the ending."